Modification of the wastewater treatment system
Project description
Modification of the wastewater treatment system in the rooms of the treatment building on a geodetic basis
- 128 m of DN15 to DN65 piping
- 81 Components
- 24 brackets
Key facts
- Concept Design
- Basic Design
- Scan measurement on site
- Planning the components
- Planning the piping and brackets
- Planning a steel construction platform
- Detail Design
- Creation of production documents
- Site management during implementation
- Production support
- Assembly planning and coordination
- Trade coordination
- Construction supervision
- Reporting
- Final documentation